Waste Dump Closure and Cost Estimates at AngloGold Ashanti Iduapriem

Authors

  • George Agyei University of Mines and Technology
  • K. O. A. Arhinful

Keywords:

Waste Dump, Reclamation, Revegetation, Estimates

Abstract

AngloGold Ashanti Iduapriem Mine is a surface gold mine which produces waste rock in its operations. The waste rock forms waste dumps which grow over the years, and will ultimately need to be closed down when they are filled to the maximum capacity. The mine has closure plans for the waste dumps and the closure activity will incur cost. This research was carried out to study the waste dump reclamation and closure plan for the Ajopa waste dump, and estimate the associated cost. The aim of the closure is to establish a permanent stable landscape that is environmentally compatible with surrounding undisturbed land. The waste dump will be closed with a progressive rehabilitation technique. The key activities involved in the reclamation plan, which are earthworks, capping and revegetation were identified and studied into detail. The reclamation plan and cost estimates were prepared on the basis that AngloGold Ashanti Iduapriem Mine would contract with a third-party contractor to fully execute the required closure and reclamation activities. The cost was then estimated using price quotes from vendors or contractors located around the mining area. Results showed that waste dump closure and reclamation programme for Iduapriem Mine are consistent with Ghana Mining and Environmental guidelines. The total closure and reclamation cost was estimated to be US$ 581 488.18. Since any delay in the closure and reclamation could incur additional cost, it was advised that the mine should execute the closure and reclamation plan without delay. 

 

Keywords: Waste Dump, Reclamation, Revegetation, Estimates

References

Anon., 2006, “Mine Rehabilitation†Leading Practice Sustainable Development Program For The Mining Industry, Department of Industry Tourism and Resources.http://www.ag.gov.au/cca. Accessed 28/12/15

Anon., (2007). “Plan of Operations for Waste Rock Managementâ€, Red Dog Mine Closure and Reclamation Plan, SRK Consulting (Canada) Inc. Vancouver, B.C. V6E 3X2.

Anon., (2016a), “Closure and Reclamationâ€, The Environmental Impact Statement, AngloGold Ashanti Iduapriem Mine. 166pp.

Anon., (2016b), “Reclamation Criteria†The Reclamation Security Agreement AngloGold Ashanti Iduapriem Mine. pp. 13.

Buaba, J. A. (2015), “Waste Dump Reclamation Practices†Unpublished BSc Project Report, University of Mines and Technology, Tarkwa, pp. 10-22.

Davis, D. (2004), “Cappingâ€, Waste Rock Dumps Guideline, WMC Resources Ltd. pp. 9.http://www.ea.gov.au/industry/sustainable/mining/booklets/index.html

Quaicoe, J. (2015), “Mine Closure and Liability Estimates At AngloGold Ashanti Iduapriem Mine†Unpublished BSc Project Report, University of Mines and Technology, Tarkwa.40 pp.

Zahl, E.G., Biggs, F., Boldt, C.M.K., Connolly, R.E., Gertsch, L., and Lambeth, R.H., 1992, “Waste Disposal and Contaminant Controlâ€, in Hartman, H.L., ed., SME Mining Engineering Handbook: Littleton, CO, Society for Mining, Metallurgy and Exploration Inc., p. 1170-1180

Downloads

Published

2017-12-13